کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9817450 1518765 2005 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Super neutrino project: Design and development
موضوعات مرتبط
مهندسی و علوم پایه مهندسی مواد سطوح، پوشش‌ها و فیلم‌ها
پیش نمایش صفحه اول مقاله
Super neutrino project: Design and development
چکیده انگلیسی
BNL plans to create a very long baseline super neutrino beam facility by upgrading the AGS from the current 0.14 MW to 1.0 MW and beyond. The proposed facility consists of three major components. First is a 1.5 GeV superconducting linac to replace the booster as injector for the AGS, second is the performance upgrade of the AGS itself for higher intensity and repetition rate, and finally is the target and horn system for the neutrino production. The major contribution for the higher power is from the increase of the repetition rate of the AGS from 0.3 Hz to 2.5 Hz, with moderate increase from the intensity. The accelerator design considerations to achieve high intensity and low losses for the new linac and the AGS will be presented. The target and horn design for high power operation and easy maintenance will also be covered.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms - Volume 241, Issues 1–4, December 2005, Pages 286-292
نویسندگان
,