کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
994247 936074 2008 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A portfolio risk analysis on electricity supply planning
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
A portfolio risk analysis on electricity supply planning
چکیده انگلیسی

Conventional electricity planning selects from a range of alternative technologies based on the least-cost method without assessing cost-related risks. The current approach to determining energy generation portfolios creates a preference for fossil fuel. Consequently, this preference results in increased exposure to recent fluctuations in fossil fuel prices, particularly for countries heavily depend on imported energy.This paper applies portfolio theory in conventional electricity planning with Taiwan as a case study. The model objective is to minimize the “risk-weighted present value of total generation cost”. Both the present value of generating cost and risk (variance of the generating cost) are considered. Risk of generating cost is introduced for volatile fuel prices and uncertainty of technological change and capital cost reduction. The impact of risk levels on the portfolio of power generation technologies is also examined to provide some valuable policy suggestions. Study results indicate that replacing fossil fuel with renewable energy helps reduce generating cost risk. However, due to limited renewable development potential in Taiwan, there is an upper bound of 15% on the maximum share of renewable energy in the generating portfolio. In the meantime, reevaluating the current nuclear energy policy for reduced exposure to fossil fuel price fluctuations is worthwhile.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Policy - Volume 36, Issue 2, February 2008, Pages 627–641
نویسندگان
, ,