کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
995122 936168 2010 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Regional-scale electric power system planning under uncertainty—A multistage interval-stochastic integer linear programming approach
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Regional-scale electric power system planning under uncertainty—A multistage interval-stochastic integer linear programming approach
چکیده انگلیسی

In this study, a multistage interval-stochastic regional-scale energy model (MIS-REM) is developed for supporting electric power system (EPS) planning under uncertainty that is based on a multistage interval-stochastic integer linear programming method. The developed MIS-REM can deal with uncertainties expressed as both probability distributions and interval values existing in energy system planning problems. Moreover, it can reflect dynamic decisions for electricity generation schemes and capacity expansions through transactions at discrete points of a multiple representative scenario set over a multistage context. It can also analyze various energy-policy scenarios that are associated with economic penalties when the regulated targets are violated. A case study is provided for demonstrating the applicability of the developed model, where renewable and non-renewable energy resources, economic concerns, and environmental requirements are integrated into a systematic optimization process. The results obtained are helpful for supporting (a) adjustment or justification of allocation patterns of regional energy resources and services, (b) formulation of local policies regarding energy consumption, economic development, and energy structure, and (c) analysis of interactions among economic cost, environmental requirement, and energy-supply security.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Policy - Volume 38, Issue 1, January 2010, Pages 475–490
نویسندگان
, , , , ,