کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
995166 936173 2009 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Slow and stunted: Plutonium accounting and the growth of fast breeder reactors in India
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Slow and stunted: Plutonium accounting and the growth of fast breeder reactors in India
چکیده انگلیسی

The Indian Department of Atomic Energy (DAE) has projected a large growth of nuclear power in the country predominantly based on breeder reactors. These projections use a simplistic methodology that does not carefully account for the availability of plutonium that is required to fuel breeder reactors. In this paper, we demonstrate that this methodology is problematic, in particular that it would result in negative balances of plutonium if the DAE's projections were to come true. The DAE's projections also ignore constraints coming from reprocessing capacity in the country. As an alternative, we project the possible growth of nuclear power based on breeder reactors using a methodology consistent with plutonium constraints. The resulting breeder reactor capacity will be only between 17% and 40% of the DAE's projections, and will likely never constitute a major source of electricity in India for several decades at the very least.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Policy - Volume 37, Issue 12, December 2009, Pages 5028–5036
نویسندگان
, ,