کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10373226 878226 2005 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Development of a risk-based maintenance (RBM) strategy for a power-generating plant
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی بهداشت و امنیت شیمی
پیش نمایش صفحه اول مقاله
Development of a risk-based maintenance (RBM) strategy for a power-generating plant
چکیده انگلیسی
The case study of a power-generating unit in the Holyrood thermal power generation plant is used to illustrate the methodology. Results indicate that the methodology is successful in identifying the critical equipment and in reducing the risk of resulting from the failure of the equipment. Risk reduction is achieved through the adoption of a maintenance plan which not only increases the reliability of the equipment but also reduces the cost of maintenance including the cost of failure.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Loss Prevention in the Process Industries - Volume 18, Issue 2, March 2005, Pages 69-81
نویسندگان
, , ,