کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10401341 891193 2011 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Flexible investment decisions in the European interconnected transmission system
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Flexible investment decisions in the European interconnected transmission system
چکیده انگلیسی
Investment decisions in the power transmission system are vulnerable to substantial long-term uncertainties. Especially, in large interconnected power systems like in Europe, the impact of different influencing factors on the decision-making process is hard to estimate. In the presented approach, stochastic simulations incorporate uncertainties like the development of fuel costs and demand growth. The resulting operation plan of the available power plants and the respective utilization of the transmission network are obtained by calculating the (least-cost) optimal power flow. The performance of possible network upgrades in uncertain scenarios is evaluated by applying a real options approach based on Monte Carlo simulations. The focus of the presented work is on the strategic flexibility that FACTS devices can offer in order to appropriately cope with the uncertain development of the future. A case study for the cross-border connection between Germany and the Netherlands shows the applicability and practicability of the presented approach.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 81, Issue 4, April 2011, Pages 984-994
نویسندگان
, , , , ,