کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10504474 946581 2005 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Mandated monitoring of post-project impacts in the Czech EIA
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Mandated monitoring of post-project impacts in the Czech EIA
چکیده انگلیسی
Altogether, 801 documents of consent (50% of all) issued under the EIA Act No. 244/1992 by the competent authorities in the Czech Republic between 1993 and 2001 were studied. The aim of the analysis was to find and characterize conditions prescribing to the developer to perform ex-ante and ex-post monitoring of potential impacts of projects submitted for approval. It was found that each of the studied documents (standpoints) contained on average three to four conditions prescribing to collect data on various environmental factors during the preparation, implementation and/or operation phase of the development in question. The number of monitoring conditions contained in the standpoints issued by the Ministry of Environment as well as by the District Offices increased during the period studied from about two to five per project indicating a growing interest in and/or need to obtaining such data. Even though there is a good legal background for collecting monitoring data from implementation and operation phase of new developments, the Czech EIA Act (similarly as EIA acts in other countries) does not provide any practical background for this activity. Without relevant institutional, personal and financial support the possibility to impose post-project monitoring to the developer remains rather a challenge to, not advantage of the Czech EIA Act.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Environmental Impact Assessment Review - Volume 25, Issue 3, April 2005, Pages 227-238
نویسندگان
, ,