کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10674555 1010322 2007 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A Risk Mitigation Methodology for New Product and Process Design in Concurrent Engineering Projects
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
A Risk Mitigation Methodology for New Product and Process Design in Concurrent Engineering Projects
چکیده انگلیسی
Based on earlier work on risk quantification, a new risk mitigation methodology is developed for new product and process design in concurrent engineering projects. First the most prominent risks in the product life cycle are identified and quantified. Then five computational algorithms are developed and used to find feasible solutions for mitigating these risks: Least-Cost-First, Highest-Risk-First, Minimum-Cost-Risk-Ratio- First, Random-Search and a Genetic Algorithm. Based on the available mitigation budget and strategic objectives of the project the best mitigation strategy is then recommended to the project managers. Actual financial outcomes of an industry project were used to successfully validate the methodology.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: CIRP Annals - Volume 56, Issue 1, 2007, Pages 167-170
نویسندگان
, , , ,