کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1133835 956045 2013 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Lead time control in multi-class multi-stage assembly systems with finite capacity
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Lead time control in multi-class multi-stage assembly systems with finite capacity
چکیده انگلیسی


• We modeled multi-class multi-stage assembly systems as queuing networks.
• We developed a multi-objective model to optimally control the rates of assembly and manufacturing stations.
• The main contribution is to develop an analytical approach for the problem studied with finite capacity and different class types.

In this paper, we model multi-class multi-stage assembly systems with finite capacity as queueing networks. It is assumed that different classes (types) of products are produced by the production system and products’ orders for different classes are received according to independent Poisson processes. Each service station of the queueing network specifies a manufacturing or assembly operation, in that processing times for different types of products are independent and exponentially distributed random variables with service rates, which are controllable, and the queueing discipline is First Come First Served (FCFS). Different types of products may be different in their routing sequences of manufacturing and assembly operations. For modeling multi-class multi-stage assembly systems, we first consider every class separately and convert the queueing network of each class into an appropriate stochastic network. Then, by using the concept of continuous-time Markov processes, a system of differential equations is created to obtain the distribution function of manufacturing lead time for any type of product, which is actually the time between receiving the order and the delivery of finished product. Furthermore, we develop a multi-objective model with three conflicting objectives to optimally control the service rates, and use goal attainment method to solve a discrete-time approximation of the original multi-objective continuous-time problem.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 66, Issue 4, December 2013, Pages 808–817
نویسندگان
, , ,