کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1134187 | 1489094 | 2014 | 7 صفحه PDF | دانلود رایگان |
• We present the problem of scheduling material handling in satellite cross-docking terminals.
• We represent the mathematical representation of the problem.
• A fast heuristic algorithm is presented which is applicable to practical problems.
• The results depict the efficiency of the proposed approach.
In a less-than-truckload logistic network, the satellite cross-dock is in charge of local deliveries. These terminals operate in two separate shifts: consolidating pickup freight for overnight shipments and processing received products for early morning deliveries. Satellite cross-docks are flexible when scheduling trucks and where the priority is to minimize handling cost. In this paper, we formalize cross-docking process by presenting a mathematical model. We develop a sequential priority-based heuristic algorithm to deal with practical problems. Numerical results show the stability of the heuristic method for fairly large size problems.
Journal: Computers & Industrial Engineering - Volume 72, June 2014, Pages 43–49