کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1142062 957130 2016 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
موضوعات مرتبط
مهندسی و علوم پایه ریاضیات ریاضیات گسسته و ترکیبات
پیش نمایش صفحه اول مقاله
Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
چکیده انگلیسی

In the scheduling with generalized due dates, the due dates are sequenced in the EDD order and assigned to the jobs by the increasing order of their completion times such that the iith completed job receives the iith due date. The exact complexity of the single machine scheduling of minimizing total weighted tardiness with generalized due dates is a long standing open problem. We show in this paper that this problem is unary NP-hard.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Operations Research Letters - Volume 44, Issue 1, January 2016, Pages 92–95
نویسندگان
, ,