کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1728579 | 1521139 | 2013 | 7 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Relation between task complexity and variability of procedure progression during an emergency operation
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
In this study, the relation between task complexity and variability of procedure progression during an emergency operation was investigated by comparing the two quantitative measures. To this end, the TACOM measure and VPP measure were applied to evaluate the complexity of tasks and variability of procedure progression, respectively. The TACOM scores and VPP scores were obtained for 60 tasks in the OPERA database, and a correlation analysis between two measures and a multiple regression analysis between the sub-measures of the TACOM measure and VPP measure were conducted. The results showed that the TACOM measure is positively associated with the VPP measure, and the abstraction hierarchy complexity mainly affected the variability among the sub-measures of TACOM. From these findings, it was discussed that the task complexity is related to an operator's procedural variability and VPP measure can be useful for explaining the operator's behaviors.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Annals of Nuclear Energy - Volume 59, September 2013, Pages 230-236
Journal: Annals of Nuclear Energy - Volume 59, September 2013, Pages 230-236
نویسندگان
Yochan Kim, Jinkyun Park, Wondea Jung,