کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1729397 1521164 2011 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
RETRAN analysis results of feedwater pump trip transient for Lungmen ABWR Plant
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
RETRAN analysis results of feedwater pump trip transient for Lungmen ABWR Plant
چکیده انگلیسی

The RETRAN model of Lungmen ABWR was used to simulate one feedwater pump trip (FWPT) transient of the Lungmen start-up test program. The purpose of this test is to verify the capability of one surviving Turbine Driven Reactor Feedwater Pump (TDRFP) plus a Motor Driven Feedwater Pump (MDRFP) to continue operating the reactor stably following the incident. There are three major control systems implanted in Lungmen RETRAN model (LRM), which include Recirculation Flow Control System (RFCS), Steam Bypass and Pressure Control System (SBPCS), and Feedwater Control System (FWCS). The reactor water level margin with respect to the low level scram setpoint in the transient is monitored to confirm whether the acceptance criteria has been satisfied, which depends on the responses of the control systems to the FWPT transient.The analysis result of base case at 100% rated power/100% rated core flow with automatic start of MDRFP demonstrates that the acceptance criteria are met, which shows that the water level still sustains ample margin of 30 cm above the low level setpoint, and the reactor does not scram. To get more insight into the function of MDRFP, a set of sensitivity studies with the assumption of unavailable MDRFP, and with a different initial condition which extended to the maximum allowable core flow of 111% rated at rated power, was conducted to verify the superior capability of power coastdown due to the RIPs runback logic under the lowest load line, and also the delay time of the Reactor Internal Pumps (RIPs). Finally, it is concluded that FWPT transient without start of MDRFP eventually actuates the low level scram signal, even with the lowest load line at rated power as the initial condition.


► The RETRAN model was used to predict one feedwater pump trip (FWPT) transient.
► The result shows that the margin sustains at least 30 cm above the L3 setpoint.
► The unavailable motor driven pump case eventually actuates the low level scram signal.
► The lowest load line case without motor driven pump still actuates the L3 scram.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Annals of Nuclear Energy - Volume 38, Issue 7, July 2011, Pages 1598–1608
نویسندگان
, , ,