کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1729513 | 1521168 | 2011 | 5 صفحه PDF | دانلود رایگان |

According to the long term management strategy for spent fuels in Korea, they will be transported from the spent fuel pools in each nuclear power plant to the central interim storage facility (CISF) which is to start operation in 2016. At the start of the operation of the final repository (FR), by the year 2065, transport will then take place between the CISF and the FR. Therefore, we have to determine the safe and economical logistics for the transportation of these spent fuels by considering their transportation risks and costs. In this study, we developed four transportation scenarios for a maritime transportation by considering the type of transportation casks and transport means in order to suggest safe and economical transportation logistics for the spent fuels in Korea. And, we estimated and compared the transportation risks for these four transportation scenarios. Also, we estimated and compared the transportation risks resulting from accidents during the transportation of PWR and PHWR spent fuels by road trailers from the CISF and the FR. From the results of this study, we found that risks resulting from accidents during the transportation of the spent fuels have a very low radiological risk activity with a manageable safety and health consequences. The results of this study can be used as basic data for the development of safe and economical logistics for a transportation of the spent fuels in Korea by considering the transportation costs for the four scenarios which will be needed in the near future.
Journal: Annals of Nuclear Energy - Volume 38, Issues 2–3, February–March 2011, Pages 535–539