کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1730531 | 1521215 | 2007 | 12 صفحه PDF | دانلود رایگان |

Correct prediction of water hammer transients is of paramount importance for the safe operation of the plant. Therefore, verification of computer codes capability to simulate water hammer type transients is a very important issue at performing safety analyses for nuclear power plants. Verification of RELAP5/MOD3.3 code capability to simulate water hammer type transients employing the experimental investigations is presented. Experience gained from benchmarking analyses has been used at development of the detail RELAP5 code RBMK-1500 model for simulation of water hammer effects in reactor main circulation circuit. In RBMK-type reactors the water hammers can occur in cases of rapid check valve operation. The performed analysis using RELAP5 code RBMK-1500 model has shown that in general the maximum values of the pressure pulses due to water hammer do not exceed the permissible loads on the pipelines.
Journal: Annals of Nuclear Energy - Volume 34, Issues 1–2, January 2007, Pages 1–12