کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1744685 1522156 2015 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems
ترجمه فارسی عنوان
تحقیق در مورد به حداقل رساندن زمان چرخه و مصرف انرژی کل در سیستم خط مونتاژ رباتیک
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
چکیده انگلیسی


• Particle Swarm Optimization is proposed to solve robotic assembly line balancing problems.
• Time based and energy based models are proposed for robotic assembly line balancing.
• Thirty-two datasets are used for evaluation of the models proposed.
• The performances of the two models are reported.

Manufacturing industries give importance to the reduction of energy consumption due to the increase in energy cost and to create an eco-friendly environment. Assembly line is considered to be one of the cost intensive systems. Robots are recently being used to perform the assembly tasks instead of manual labor. There is a requirement of efficiently balancing the assembly line by allocating equal amount of work to workstations and assignment of best fit robot to perform the tasks allocated to those workstations. The authors could not find any research on optimizing cycle time and total energy consumption concurrently in robotic assembly line systems to date. The objective of this paper is to propose models with dual focus on time and energy to minimize the cycle time and total energy consumption simultaneously, one model (time based model) with the primary focus to optimize cycle time and the other model (energy based model) with the primary focus to optimize total energy consumption. Particle swarm optimization is used as the optimization tool to solve this problem. Computational experiments are conducted on the proposed models using the benchmark problems available in the open literature and the results are presented. The two models proposed in this paper are very well applicable to automobile body shop with robot based lines. The models proposed have a significant managerial implication in real assembly line systems. Depending upon the priorities of the management, primary focus on reducing either cycle time or total energy consumption, suitable models could be selected. The proposed models are useful to reduce the total energy consumption and cycle time in robotic assembly lines. It is observed that the computation time for the time based model is less compared to energy based model.

Figure optionsDownload as PowerPoint slide

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Cleaner Production - Volume 90, 1 March 2015, Pages 311–325
نویسندگان
, , ,