کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1829214 1027453 2008 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Construction of a beam rebuncher for RIKEN RI-beam factory
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
پیش نمایش صفحه اول مقاله
Construction of a beam rebuncher for RIKEN RI-beam factory
چکیده انگلیسی
A beam rebuncher for the RIKEN radioactive-isotope beam factory project has been constructed and is placed in a long beam line between the first two ring cyclotrons in the accelerator cascade. The rebuncher resonator, having four rf gaps in it, operates at a fixed frequency of 109.5 MHz for the longitudinal focusing of heavy ion beams at 11.0MeV/u. To reduce the sparking problem in the rf gaps, a new type of H-mode resonator has been adopted, where the distribution of the gap voltage is well equalized. In fact, the ratio of the gap voltages is about 1.26, whereas those of the interdigital-H (IH)- and crossed-bar-H (CH)-mode structures are larger than 2.0. The total gap voltage, which is defined as the sum of the four gap voltages, has reached 495 kV at a power consumption of 4.7 kW.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 592, Issue 3, 21 July 2008, Pages 171-179
نویسندگان
, , , , , , , , , ,