Biomass waste co-firing with coal applied to the Sines Thermal Power Plant in Portugal
ترجمه فارسی عنوان
زباله های سوخت زیستی با زغال سنگ مورد استفاده در نیروگاه حرارتی سینس در پرتغال
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی مهندسی شیمی (عمومی)
چکیده انگلیسی


• The possibility of using waste biomass as fuel in a coal-fired thermal power plant is studied.
• Co-firing biomass waste, from forestry operations, with bituminous coal was simulated.
• The Sines Thermal Power Plant in Portugal was used as a case study.
• Reductions of more than 1,000,000 tons/year of CO2 were calculated.
• Co-firing is still not economically viable due to the high cost of the residual biomass.

Environmental issues raised by the use of fossil fuels lead to the search for alternatives that promote the reduction of emissions of greenhouse gases. CO2 has been identified as being the most important and urgent to control. Co-firing is a technique that allows the simultaneous combustion of different types of fuels, for example coal and biomass, combining the advantages of both. This study characterises the advantages of the system and the possibilities of using waste biomass as fuel in a coal-fired thermal power plant. For this, co-firing biomass waste, from forestry operations, with bituminous coal was simulated. Then reductions in CO2 emissions into the atmosphere from Sines Thermal Power Plant in Portugal were calculated, showing a reduction of more than 1,000,000 tons/year of CO2. Also it was verified that although environmentally advantageous, co-firing is still not economically viable due to the high cost of the residual biomass, combined with its low-energy density and high transportation costs.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fuel - Volume 132, 15 September 2014, Pages 153–157
نویسندگان
, , ,