A single submerged membrane bioreactor (MBR) for nitrification of ammonium and a pre-denitrification MBR process for total nitrogen (TN) removal were investigated in comparison. A single nitrifying MBR was fed with synthetic ammonium wastewater of up to 900 mgN/l without organics so that the MBR was maintained as a pure nitrifying system. A high nitrifying capacity around 1.8 kgNH4-N/m3/day was achieved while keeping the ammonium oxidation rate above 98%. Sludge volume index (SVI) gradually decreased down to less than 50 indicating good settleability of nitrifying sludge. The increase of suction pressure was less than 5 cm Hg over 7-months of operation. TN removal efficiency was determined in a pre-denitrification configuration with an anoxic reactor. Synthetic wastewater of 1200 mgCOD/l and 200 mgN/l was fed to the system at loads of 2.4 kgCOD/m3/day and 0.4 kgN/m3/day, respectively. As the internal recycle ratio from aerobic to anoxic zone increased from 2 to 6, TN removal efficiency was enhanced from 70 ± 9 to 89 ± 3%. With the sludge concentration of around 12,000 mg/l, SVI was highly fluctuated from 60 to 350 indicating the partial deterioration of sludge settleability. The suction pressure after 8 months of operation increased to above 10 cm Hg which is higher than that in a single nitrifying MBR. The concentration of extracellular polymeric substances (EPS), especially for carbohydrate content, was higher in the operation of a pre-denitrification MBR process than in a single nitrifying MBR. It is likely that the sludge characteristic such as settleability is related with membrane fouling but, further extensive study is needed. The performance of a pre-denitrification MBR process was also verified with real petrochemical nitrogen wastewater.
Journal: Journal of Industrial and Engineering Chemistry - Volume 16, Issue 4, 25 July 2010, Pages 546–550