کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
246577 502380 2014 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
ترجمه فارسی عنوان
با استفاده از یک تکامل متفاوت دیافراگم فازی با استفاده از روش سریال برای حل مشکلات برنامه ریزی منابع محدود
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی


• This study presents a novel optimization algorithm FCDE.
• Chaotic mapping is used to prevent the algorithm from premature convergence.
• Clustering is utilized to enhance the convergence.
• FCDE is incorporated with serial method to handle resource-constrained problem.

The resource-constrained problem seeks to find the optimal sequence that minimizes project duration under current precedence constraints and resource limitations. This study integrates the fuzzy c-means clustering technique and the chaotic technique into the Differential Evolution (DE) algorithm to develop the Fuzzy Clustering Chaotic-based Differential Evolution (FCDE) algorithm, an innovative approach to solving complex optimization problems. Within the FCDE, the chaotic technique prevents the optimization algorithm from premature convergence and the fuzzy c-means clustering technique acts as several multi-parent crossover operators in order to utilize population information efficiently and enhance convergence efficiency. Further, this study applies a serial method to reflect individual-user priorities into the active schedule and the project duration calculations. The FCDE and serial method are then integrated into a novel optimization model called the Fuzzy Clustering Chaotic-based Differential Evolution for Solving Resource Constrained Project Scheduling Problem (FCDE-RCPSP). Experiments run indicate that the proposed FCDE-RCPSP obtains optimal results more reliably and efficiently than the benchmark algorithms considered. The FCDE-RCPSP is a promising alternative approach to handling resource-constrained project scheduling problems.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 37, January 2014, Pages 88–97
نویسندگان
, , ,