کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
246802 | 502389 | 2013 | 10 صفحه PDF | دانلود رایگان |
Cranes maintain a central role in construction projects, and tower cranes are one of the major equipment used in the construction of high-rise buildings. As the scale of construction projects increases, selecting a proper crane becomes more important for the successful completion of projects, especially in regards to taller buildings. To provide lift engineers with a planning tool, this paper presents a crane selection methodology for high-rise building construction projects based on crane productivity performance, carbon footprint impact and simulation process. The crane productivity analysis considers a tower crane with two jibs that operates using propellers mounted at the end of each jib to improve the performance of crane operations. This paper presents a methodology to quantify and assess the environmental footprint (CO2 emissions) associated with the tower crane swing operation. A case study is presented to demonstrate the effectiveness of crane productivity and CO2 emission analysis for building construction projects.
► A crane selection method for high-rise building construction projects is proposed.
► Tower crane productivity performance and carbon footprint impact are analyzed.
► Comparative analysis between traditional and double-jib tower cranes is presented.
► A simulation model is developed to assist in crane selection process.
► Presented case study demonstrates the potential capabilities of the methodology.
Journal: Automation in Construction - Volume 31, May 2013, Pages 255–264