کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
262491 504035 2015 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Comparative analysis of energy related performance and construction cost of the external walls in high-rise residential buildings
ترجمه فارسی عنوان
تجزیه و تحلیل مقایسه ای از عملکرد مربوط به انرژی و هزینه ساخت دیوار های خارجی در ساختمان های مسکونی بلند
کلمات کلیدی
تجزیه و تحلیل هزینه، عملکرد انرژی، دیوار خارجی، هزینه چرخه زندگی ساختمان مسکونی، ارزیابی ارزش
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
چکیده انگلیسی


• Energy performance and cost analysis of external walls is proposed.
• The energy performance is greater in the order of CFRC, GFRC and RC.
• The construction costs is more in the order of CFRC, GFRC and RC.
• Considering the LCC, RC is most satisfactory up to 6 years after construction, GFRC from 6 years to 26 years, and CFRC thereafter respectively.

In the design phase of a high-rise residential building, stakeholders should adopt the proper external wall system by considering energy performance and IEQ as well as construction cost and structural stability. The energy related performance and construction cost of external walls affect the life cycle cost. Therefore, also a value analysis of the LCC in terms of the energy performance is required. The purpose of this study was to evaluate the energy related performance and construction cost of external walls in high-rise residential buildings, which are the currently staple external walls, using reinforced concrete (RC), glass fiber reinforced concrete (GFRC) and cellulose fiber reinforced cement (CFRC). All the wall systems have the same doors and windows in their bodies for equal comparison of energy efficiency and construction cost. The energy efficiency of the CFRC external walls was high while the construction cost for RC external walls was low. The value assessment considering the LCC and the residents’ health revealed that RC external walls were most satisfactory up to 6 years after construction, GFRC from 6 years to 26 years, and CFRC thereafter, respectively. The findings of this research will be valuable for stakeholders deciding on an external wall system.

Figure optionsDownload as PowerPoint slide

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy and Buildings - Volume 99, 15 July 2015, Pages 67–74
نویسندگان
, , ,