کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
271107 504988 2014 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
AC operation of large titanium sublimation pumps in a magnetic field: Results of the test stand for the W7-X neutral beam injectors
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
AC operation of large titanium sublimation pumps in a magnetic field: Results of the test stand for the W7-X neutral beam injectors
چکیده انگلیسی


• A test stand for the high vacuum pumping system of the NBI at W7-X is presented.
• In W7-X large titanium sublimation pumps (TSPs) will be operated using AC.
• AC ohmic heating allows reliable operation of TSPs in the stray B field of W7-X.
• The effect of the frequency and waveform of the AC current has been analysed.
• AC-operated TSPs in B field perform similarly to DC-operated TSPs at ASDEX-upgrade.

A neutral beam injection (NBI) system is being built for the Stellarator experiment Wendelstein 7-X (W7-X) currently under construction at IPP Greifswald. The NBI system consists of two injectors which are essentially a replica of the system present in the Tokamak experiment ASDEX-Upgrade at IPP Garching. A vacuum system with high pumping speed and large capacity is required to ensure proper vacuum conditions in the neutral beam line. For this purpose, large titanium sublimation pumps (TSP) are installed inside the NBI boxes, consisting of 4 m long hanging wires containing Ti and the surrounding condensation walls. The wires are DC ohmically heated up with 142 A to Ti sublimation temperature. A TSP system has been operated since many years in the AUG-NBI system, sublimating Ti in the pauses between the plasma discharges, when no magnetic field is present. However, at W7-X the superconducting coils generate a magnetic field permanently during experimental campaigns, whose stray B field with a maximum of 30 mT, affects the TSPs. Operated with DC, the wires would be deflected against the surrounding panels due to the Lorentz force. A simple possible solution is heating with AC, which reduces the wire deflection amplitude, inducing a risky wire oscillation. The feasibility of the AC operation in an equivalently strong B field such as the stray B field around W7-X has been demonstrated in a test stand for different AC waveforms and frequencies. Several test campaigns have shown no qualitative difference in the pumping properties between AC and DC operation of the TSP and no critical dynamic behaviour of the wires.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 89, Issue 12, December 2014, Pages 3070–3077
نویسندگان
, , , , , , ,