Commissioning and first results of the ITER-relevant negative ion beam test facility ELISE
چکیده انگلیسی

The test facility ELISE which was constructed in the last three years at the Max-Planck-Institut für Plasmaphysik (IPP), Garching, is an important intermediate step of the development of the neutral beam system for ITER. ELISE allows gaining an early experience of the performance and operation of large RF driven sources for negative hydrogen ions and will give an important input for the commissioning and the design of the SPIDER and MITICA test facilities at Padua and the ITER neutral beam system. ELISE has gone recently into operation with first plasma and beam pulses. The experiments aim at the demonstration of an ion beam at the required parameters within 2 years of operation until end of 2014, the end of the service contract with F4E for the establishment and exploitation of ELISE.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 88, Issue 12, December 2013, Pages 3132–3140
نویسندگان
, , , , , , , , , , , , ,