کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
271503 504996 2014 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Waste management scenario in the hot cell and waste storage for DEMO
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Waste management scenario in the hot cell and waste storage for DEMO
چکیده انگلیسی

Management strategy of radioactive waste generated in periodic replacement may be important in the point of view of fusion reactor design, because it has a large impact on the design of the hot cell and waste storage in the plant. In the replacement period of a fusion power reactor, the assembly of blanket or divertor modules needs to be removed from the reactor in order to minimize remote maintenance in the vacuum vessel and to attain reasonable plant availability. In the hot cell, the modules will be removed from the back plate of the assembly. Here, note that the active cooling must be done by a way that does not cause contamination of the hot cell environment due to dispersion of tritium and tungsten dust. In this sense, the cooling scenario is adopted that the existing pipe of cooling water in the assembly is connected to a different cooling water system in the hot cell. On the other hand, it is assumed that the structural material (F82H) of the blanket and divertor is not recycled due to its high contact dose rate. It should be crushed into small pieces to reduce volume of the waste and required storage space. In this paper, the basic idea of the waste management scenario and the conceptual design in the hot cell and waste storage for DEMO has been proposed.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 89, Issues 9–10, October 2014, Pages 2033–2037
نویسندگان
, , , , , , , , ,