کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
271764 505006 2013 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The new build to print design of the ITER Torus Cryopump
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
The new build to print design of the ITER Torus Cryopump
چکیده انگلیسی

The common design of the cryopumps for pumping the divertor and the cryostat has been completed at ITER following more than 10 years of development including prototyping and a number of design studies. This final design, which will be validated by building a Pre-Production Cryopump, achieves a number of simplifications and is expected to solve issues identified in previous concepts.The paper will present the build to print manufacturing design of the cryopump according to European Standards. The fabrication and qualification methods will be discussed and a summary of the main manufacturing methods will be given. The design of the valve assembly and its integration in the cryopump with the valve shaft double bellows will be described in detail.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 88, Issues 6–8, October 2013, Pages 760–763
نویسندگان
, , , , , , ,