کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
272061 505011 2012 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Verification test results of a cutting technique for the ITER blanket cooling pipes
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Verification test results of a cutting technique for the ITER blanket cooling pipes
چکیده انگلیسی

For replacement of the first wall (FW) of the international thermonuclear experimental reactor (ITER), cutting and welding tools for the cooling pipes must be able to access a pipe from the surface side of the FW and cut/weld the pipe from the inside the cooling pipe (inner diameter: 42.72 mm, thickness: 2.77 mm). The cutting tool for the pipe end is required to cut a flat plate circularly from the surface side of the FW (cutting diameter: approximately 44 mm, plate thickness: 5 mm). To determine the specifications for both the tools and the blanket hydraulic connections, the ITER Organization (IO) and the Japan Domestic Agency (JADA) conducted research and development activities regarding the FW replacement. This paper describes the current status of the development of cutting tools for the cooling pipe connection.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 87, Issues 7–8, August 2012, Pages 1218–1223
نویسندگان
, , , , , , , , ,