The EVEDA Li test loop (ELTL) successfully completed its construction and installation of a total of 2.5-ton Li in the frame work of the IFMIF/EVEDA as one of the ITER-BA. Design for the ELTL had been done from March 2009 to December 2009 in large part, and then the construction was started on November 2009 in the O-arai site of the Japan Atomic Energy Agency and completed on the middle of November 2010 after passing an authority inspection by a fire department in O-arai town. Subsequently, the 2.5-ton Li was installed to the ELTL by using a glove box in the form of ingots which is 240 mm long and 125 mm in diameter. The nitrogen concentration in the 2.5-ton Li was found to be 127 wppm. During the installation, the oxygen concentration and the humidity in the glove box were almost kept less than 20 wppm, and any large contamination by air was prevented during the handling of Li.
► Construction of the EVEDA Li test loop (ELTL) was completed on November 2010.
► A total of 2.5-ton Li in the form of ingot was installed in the ELTL by using a glove box.
► The oxygen concentration and the humidity in the glove box were kept less than 20 wppm.
► The nitrogen concentration in the 2.5-ton Li is 127 wppm.
Journal: Fusion Engineering and Design - Volume 87, Issues 5–6, August 2012, Pages 418–422