کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
272220 505016 2012 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Analysis of ITER upper port plug remote handling maintenance scenarios
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Analysis of ITER upper port plug remote handling maintenance scenarios
چکیده انگلیسی

The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones.The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time.The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated.The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.


► Remote Handling Study Centre: providing RH compatibility analysis.
► Simulation: virtual reality including kinematics and realtime physics simulator.
► Applied on analysis of RH compatibility of Upper Launcher component replacement.
► Resulting in lowered maintenance procedure time and lessons learned.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 87, Issues 5–6, August 2012, Pages 515–519
نویسندگان
, , , , , ,