کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
272407 505021 2011 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Operational performance of EAST cryogenic system and analysis of it's upgrading
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Operational performance of EAST cryogenic system and analysis of it's upgrading
چکیده انگلیسی

Since the first commissioning in February 2005, EAST cryogenic system was cooled down and warmed up for seven physics experimental campaigns. The operational performance of the cryogenic system, and heat loads released on different operational modes, together with cryogenic behaviors on magnets are presented in this paper. All of the thirteen pairs of current leads (CLs) in EAST tokamak have been upgraded to high temperature superconductor (HTS) current leads, so the liquefaction requirement for the refrigerator was greatly reduced and operational mode is quite different from the original optimization mode. In addition, when the physics experiments progress steadily, the requirements of the refrigeration are becoming higher. Furthermore, some components need to be replaced, because of low efficiencies or low stability. So the cryogenic system needs to be analyzed for upgrading. This paper presents the preliminary analysis.


► We measured dynamic heat load dumped into helium cryogenic system.
► We studied the dynamic behavior on superconducting magnets.
► Dynamic heat load varies greatly during plasma pulses.
► Thermo-dynamic parameters on magnets are influenced by the plasma discharges.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 86, Issue 12, December 2011, Pages 2821–2826
نویسندگان
, , , , ,