کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
272481 505025 2011 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Technical developments at the KIT gyrotron test facility
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Technical developments at the KIT gyrotron test facility
چکیده انگلیسی

Parasitic beam tunnel oscillations have been discovered on some of the series production gyrotrons for W7-X and also on the coaxial pre-prototype gyrotron for ITER. Solutions to remedy these problems have resulted in a modified beam tunnel design, technologically close to the existing beam tunnel. The new design has successfully been tested on both the coaxial and also the f-step-tunable gyrotrons and has subsequently been implemented on one of the W7-X series-production-tubes presently undergoing factory acceptance tests in Karlsruhe.The ECRH test loads at KIT are operated under normal atmospheric conditions. Several loads have eventually failed in 1 MW long pulse experiments and KIT has therefore started to design its own loads. The first KIT-load is based on a fixed conical mirror and an aluminum cylinder coated with a lossy material for increased absorption. The new load has so far successfully been used during the acceptance tests of two 1-MW CW gyrotrons. Nevertheless a new load based on pure (uncoated) stainless steel absorbers is being developed as a backup solution for the ongoing high priority gyrotron testing.A superconducting magnet capable of rapid field changes between 4.15 and 5.67 T for frequency step-tunable gyrotrons has been procured, has demonstrated a (static) field of 7.2 T and its capability of rapid field-changes.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 86, Issues 6–8, October 2011, Pages 518–521
نویسندگان
, , , , , , , , , ,