کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
273265 505042 2007 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Installation and commisionning of the EU test facility for ITER gyrotrons
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Installation and commisionning of the EU test facility for ITER gyrotrons
چکیده انگلیسی

In the frame of the EU program on the ITER electron cyclotron wave (ECW) system, the development of a 170 GHz, 2 MW CW coaxial gyrotron with depressed collector (C-GT170) has been launched during the Sixth Framework Program (2003–2006) in the European Technology Workplan. Such development relies on the availability of a test facility (TF) capable of providing both the energy sources and sinks required by this new electron tube (electrical energy, cooling capacity), and allowing the control and acquisition of a large range of signals used to understand and improve the gyrotron behaviour. The TF will be used, in a later stage, for the component test of the ITER ECW system. This paper will report on the design, installation and commissioning of the TF in Lausanne.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 82, Issues 5–14, October 2007, Pages 881–886
نویسندگان
, , , , , , , , , , , , , ,