Empirical studies differ in what they report as the underlying relation between project size and percent cost overrun. As a consequence, the studies also differ in their project management recommendations. We show that studies with a project size measure based on the actual cost systematically report an increase in percent cost overrun with increased project size, whereas studies with a project size measure based on the estimated cost report a decrease or no change in percent cost overrun with increased project size. The observed pattern is, we argue, to some extent a statistical artifact caused by imperfect correlation between the estimated and the actual cost. We conclude that the previous observational studies cannot be considered to provide reliable evidence in favor of an underlying project size related cost estimation bias. We discuss the limited, statistically robust evidence and the need for other types of studies.
► Diverging results on how project size affects cost overrun.
► Reported results from observational studies likely to be statistical artifacts.
► The robust evidence that exists is limited to smaller tasks.
Journal: International Journal of Project Management - Volume 30, Issue 7, October 2012, Pages 839–849