کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
276555 1429721 2009 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Benefits of the NEC ECC form of contract: A New Zealand case study
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Benefits of the NEC ECC form of contract: A New Zealand case study
چکیده انگلیسی

This paper examines by means of a case study the effectiveness of the project and process method detailed in the NEC Engineering and Construction Contract (ECC), as developed and published by the Institute of Civil Engineers (ICE), and makes recommendations regarding its future use.The performance of the ECC with that of a conventional form of contract delivered by two separate contractors to the same employer on the same site in similar timeframes in New Zealand provided a unique opportunity for comparison. The objective was to determine if the benefits claimed by the proponents of the NEC ECC were realised, to understand the factors which need to be considered to ensure successful use of this form of contract and to understand if any changes are needed to make the contract more effective in the NZ environment. Qualitative data were gathered by way of a series of semi-structured interviews with the project management teams of the employer and with both contractors, supplemented by secondary quantitative data extracted from project records.It is concluded that use of ECC does deliver business benefits. Minor changes are recommended for alignment with NZ statutes. It is considered that the findings will be of interest to project managers for larger and complex engineering and construction projects in any country.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 27, Issue 3, April 2009, Pages 243–249
نویسندگان
, ,