کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
296704 511736 2013 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A combined deterministic and probabilistic procedure for safety assessment of beyond design basis accidents in nuclear power plant: Application to ECCS performance assessment for design basis LOCA redefinition
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
A combined deterministic and probabilistic procedure for safety assessment of beyond design basis accidents in nuclear power plant: Application to ECCS performance assessment for design basis LOCA redefinition
چکیده انگلیسی


• We propose the procedure for safety assessment of the beyond design basis accidents.
• Deterministic (BEPU) and probabilistic (PSA) approaches are combined in the procedure.
• We premised that LOCAs for any breaks larger than TBS would be regarded as BDBA.
• Performance of ECCS is assessed against BDB LOCA for original design/design changes.
• It is shown that the proposed methodology is applicable to safety assessment of BDBA.

The concept and assessment approach of nuclear safety in nuclear power plants (NPPs) have been evolved with the technological progress and the lessons learned from the major events. Recently, studies on the integrated approach of deterministic and probabilistic method have been done. In this study, a combined deterministic and probabilistic procedure (CDPP) is proposed for safety assessment of the beyond design basis accidents (BDBAs). In the CDPP, the conditional exceedance probability obtained by the best estimate plus uncertainty method acts as go-between deterministic and probabilistic safety assessments, resulting in more reliable values of core damage frequency and conditional core damage probability. To verify applicability of the methodology, performance of the APR-1400 emergency core cooling system is assessed against large break loss of coolant accident (LOCA), under the premise that LOCAs for any breaks larger than transition break size would be regarded as BDBA. In addition, discussions are made for analysis results for allowable NPP changes of emergency diesel generator start time extension and power uprating. It is concluded that the proposed CDPP is applicable to safety assessment of BDBAs in NPPs without significant erosion of the safety margin.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 260, July 2013, Pages 165–174
نویسندگان
, , ,