کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
298293 511783 2010 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Accident management following loss-of-coolant accidents during cooldown in a Westinghouse two-loop PWR
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Accident management following loss-of-coolant accidents during cooldown in a Westinghouse two-loop PWR
چکیده انگلیسی

Operation of pressurised water reactors involves shutdown periods for refuelling and maintenance. In preparation for this, the reactor system is cooled down, depressurised and partially drained. Although reactor coolant pressure is lower than during full-power operation, there remains the possibility of a loss-of-coolant accident (LOCA), with a certain but low probability. While the decay heat to be removed is lower than that from a LOCA at full power, the reduced availability of safety systems implies a risk of failing to maintain core cooling, and hence of core damage. This is recognised though probabilistic safety analyses (PSA), which identify low but non-negligible contributions to core damage frequency from accidents during cooldown and shutdown. Analyses are made for a typical two-loop Westinghouse PWR of the consequences of a range of LOCAs during hot and intermediate shutdown, 4 and 5 h after reactor shutdown respectively. The accumulators are isolated, while power to some of the pumped safety injection systems (SIs) is racked out. The study assesses the effectiveness of the nominally assumed SIs in restoring coolant inventory and preventing core damage, and the margin against core damage where their actuation is delayed. The calculations use the engineering-level MELCOR1.8.5 code, supplemented by the SCDAPSIM and SCDAP/RELAP5 codes, which provide a more detailed treatment of coolant system thermal hydraulics and core behaviour. Both treatments show that the core is readily quenched, without damage, by the nominal SI which assumes operation of only one pump. Margins against additional scenario and model uncertainties are assessed by assuming a delay of 900 s (the time needed to actuate the remaining pumps) and a variety of assumptions regarding models and the number of pumps available in conjunction with both MELCOR and versions of SCDAP. Overall, the study provides confidence in the inherent robustness of the plant design with respect to LOCA during cooldown to cold shutdown, and in the validity of a two-tier calculational method. The results have been directly used in updating the plant shutdown PSA, by changing the success criteria for core cooling during cooldown of the plant and showing a reduction in overall risk.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 240, Issue 6, June 2010, Pages 1599–1605
نویسندگان
, , ,