An evaluation of human factors in a new nuclear power plant was conducted prior to the beginning of any business operations. After the task analysis and observation of training, two stages of interviews were carried out with the operators in the Fourth Nuclear Power Plant (NPP4). The main concerns identified were problems resulting from the operating interface of the display and controls in the main control room, usability of procedures, and the layout of the main control room.The latent human errors and suggestions were listed, and the top three problems were analyzed. The operators indicated that the alarm design issues and the critical problem of the operating mode with the VDU were worth further study in order to provide suggestions for a new interface design for future power plants.
Journal: Nuclear Engineering and Design - Volume 239, Issue 12, December 2009, Pages 3069–3075