کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
299359 | 511839 | 2007 | 8 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Speech of B. Estève “EPR deployment shifting into high gear”
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
Economics of nuclear power has been assessed by various European studies. Of particular interest in the Finnish study which supported the decision to build Finland's 5th nuclear power unit.Sensitivity studies, as well as the 2005 update of this study, demonstrate the robustness of nuclear competitiveness compared to other electricity generation means.EPR is AREVA's generation 3+ reactor: a large evolutionary power reactor with improved safety. EPR is being built at the Finnish site of Olkiluoto. It is being launched in France at Flamanville and it is licensed in the USA in view of its deployment on that market. It has also been offered to China in response to the Generation 3 international invitation to bid.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 237, Issues 12–13, July 2007, Pages 1223–1230
Journal: Nuclear Engineering and Design - Volume 237, Issues 12–13, July 2007, Pages 1223–1230
نویسندگان
Bernard Esteve,