کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
299406 511842 2007 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Experimental evaluation of human–system interaction on alarm design
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Experimental evaluation of human–system interaction on alarm design
چکیده انگلیسی

This study evaluates the practicability of automatic reset alarm system in Fourth Nuclear Power Plant (FNPP) of Taiwan. The features of auto-reset alarm system include dynamic prioritization of all alarm signals and fast system reset. Two experiments were conducted to evaluate the effect of automatic/manual reset on operation time, situational awareness (SA), task load index (TLX), and subjective ratings. All participants, including Experts and Novices, took part in the experiment on the alarm system simulator with Load Rejection procedure. The experimental results imply that the auto-reset alarm system may be applied in an advanced control room under Load Rejection procedure, because all participants’ operation time were reduced as well as Novice's SA were raised up. Nevertheless, to ensure operating safety in FNPP, the effects of the auto-reset alarm system in other procedures/special situations still need to be tested in the near future.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 237, Issue 3, February 2007, Pages 308–315
نویسندگان
, , , , , , ,