• A methodology to assess the osmotic power potential of river mouths is proposed and applied to the León River.
• The interannual and intrannual variation of the salinity structure are key to choose the optimal intake and discharge sites.
• Freshwater extraction flows are chosen considering water availability and environmental restrictions.
• A power plant is designed considering the river flow analysis, aiming for low cost and high electricity generation.
• Hydrodynamic simulations of the operation (intake-discharge) serve as a first approach to assess environmental impacts
In order to implement osmotic power as a renewable energy source it is necessary to take into account the site-specific characteristics of any river mouth location where a project is proposed. This includes the salinity structure, inter- and intra-annual flow variations, ecological and social restrictions of the flow extraction, among others. Using the case of a location with suitable conditions for osmotic power, the León River mouth at the Colombian Caribbean Coast is analyzed in detail. A discharge analysis is undertaken to determine the appropriate size of an osmotic power plant by studying the relationships of the flow extraction with the installed capacity, load factor and yearly generation of the power plant. Furthermore, hydrological and ecological characteristics of the river are taken into account. Once the design flow is determined, the impact of the flow extraction on the salinity structure is analyzed for different climatic scenarios defined by the ENSO phases. The developed methodology can be taken as a basis to assess the osmotic power potential of other rivers on a worldwide level.
Journal: Renewable Energy - Volume 68, August 2014, Pages 466–474