کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
388282 | 660921 | 2012 | 10 صفحه PDF | دانلود رایگان |

Process planning and scheduling are two key sub-functions in the manufacturing system. Traditionally, process planning and scheduling were regarded as the separate tasks to perform sequentially. Recently, a significant trend is to integrate process planning and scheduling more tightly to achieve greater performance and higher productivity of the manufacturing system. Because of the complementarity of process planning and scheduling, and the multiple objectives requirement from the real-world production, this research focuses on the multi-objective integrated process planning and scheduling (IPPS) problem. In this research, the Nash equilibrium in game theory based approach has been used to deal with the multiple objectives. And a hybrid algorithm has been developed to optimize the IPPS problem. Experimental studies have been used to test the performance of the proposed approach. The results show that the developed approach is a promising and very effective method on the research of the multi-objective IPPS problem.
► Propose a game theory based hybrid algorithm.
► Solve the multi-objective integrated process planning and scheduling problem effectively.
► The Nash equilibrium in the game theory has been used to deal with the multiple objectives.
► The hybrid algorithm has been applied to optimize the IPPS problem.
► Some solutions are better than the solutions of some other approaches.
Journal: Expert Systems with Applications - Volume 39, Issue 1, January 2012, Pages 288–297