کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
399599 1438756 2013 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Hydro unit commitment and loading problem for day-ahead operation planning problem
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Hydro unit commitment and loading problem for day-ahead operation planning problem
چکیده انگلیسی

We describe a new model for the hydro unit commitment and loading (HUCL) problem that has been developed to be used as a support tool for day-ahead operation in the Brazilian system. The objective is to determine the optimal unit commitment and generation schedules for cascaded plants with multiple units and a head-dependent hydropower model. In this paper, we propose a new mathematical model for the hydropower function where the mechanical and electrical losses in the turbine-generator are included. We model the HUCL problem as a nonlinear mixed 0–1 programming problem and solve it with a strategy that includes a two-phase approach based on dual decomposition. The computational tool allows the model to effectively schedule hydro units for the problem in the Brazilian regulatory framework. Application of the approach is demonstrated by determining a 24-time step HUCL schedule for four cascaded plants with 4170 MW of installed capacity.


► A new hydropower function with mechanical and electrical losses explicitly included.
► An efficient solution strategy based on dual decompositions techniques.
► Solution Strategy Improvements based on alternative warm-start procedure.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Electrical Power & Energy Systems - Volume 44, Issue 1, January 2013, Pages 7–16
نویسندگان
, ,