کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4388371 1618002 2016 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Constructed wetland planning-based bi-level optimization to balance the watershed ecosystem and economic development: A case study at the Chaohu Lake watershed, China
موضوعات مرتبط
علوم زیستی و بیوفناوری علوم کشاورزی و بیولوژیک بوم شناسی، تکامل، رفتار و سامانه شناسی
پیش نمایش صفحه اول مقاله
Constructed wetland planning-based bi-level optimization to balance the watershed ecosystem and economic development: A case study at the Chaohu Lake watershed, China
چکیده انگلیسی
Due to environmental carrying capacity limitations, accelerated economic development can result in serious damage to watershed ecosystems. Using planned watershed-scale constructed wetlands (CW), this paper describes how balance can be achieved between the watershed ecosystem and economic development. To accomplish this goal, a bi-level optimization model is established, in which fuzzy random variables are used to describe the uncertainties. To solve the inherent complexity and uncertainty in the proposed model, a fuzzy random simulation-based nested adaptive particle swarm optimization is designed. The model is then applied to a real-world case, the Chaohu Lake watershed in China. The model results confirmed that; CW was an effective method to balance the watershed ecosystem and economic development, environmental policy plays a key role in controlling this balance and the integrated impact of the environmental policies and economic development on the watershed ecosystem were nonlinear. These practical results should be of assistance to watershed managers when making environmental policy decisions.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Ecological Engineering - Volume 97, December 2016, Pages 106-121
نویسندگان
, , ,