کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4463901 1621701 2011 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
50,000 dams later: Erosion of the Yangtze River and its delta
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات فرآیندهای سطح زمین
پیش نمایش صفحه اول مقاله
50,000 dams later: Erosion of the Yangtze River and its delta
چکیده انگلیسی

Using 50 years of hydrologic and bathymetric data, we show that construction of ~ 50,000 dams throughout the Yangtze River watershed, particularly the 2003 closing of the Three Gorges Dam (TGD), has resulted in downstream channel erosion and coarsening of bottom sediment, and erosion of the Yangtze's subaqueous delta. The downstream channel from TGD reverted from an accretion rate of ~ 90 Mt (1Mt = 1000 000 t)/yr between the mid-1950 s and mid-1980 s to an erosion rate of ~ 60 Mt/yr after closing of the TGD. The delta front has devolved from ~ 125 Mm3 (1 Mm3 = 1000 000 m3)/yr of sediment accumulation in the 1960 s and 1970 s, when river sediment load exceeded 450 Mt/yr, to perhaps 100 Mm3/yr of erosion in recent years. As of 2007 erosion seemed to have been primarily centered at 5–8 m water depths; shallower areas remained relatively stable, perhaps in part due to sediment input from eroding deltaic islands. In the coming decades the Yangtze's sediment load will probably continue to decrease, and its middle-lower river channel and delta will continue to erode as new dams are built, and the South-to-North Water Diversion is begun.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Global and Planetary Change - Volume 75, Issues 1–2, January 2011, Pages 14–20
نویسندگان
, , , ,