کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4740649 1641171 2012 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
GPR applied to mapping utilities along the route of the Line 4 (yellow) subway tunnel construction in São Paulo City, Brazil
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات فیزیک زمین (ژئو فیزیک)
پیش نمایش صفحه اول مقاله
GPR applied to mapping utilities along the route of the Line 4 (yellow) subway tunnel construction in São Paulo City, Brazil
چکیده انگلیسی

The rapid industrial development and disorganized population growth in huge cities bring about various urban problems due to intense use of physical space on and below the surface. Subsurface problems in metropolitan areas are caused by subway line construction, which often follows the routes of utility networks, such as electric and telephone cables, water and gas pipes, storm sewers, etc. Usually, the main problems are related to damage or destruction of preexisting utilities, often putting human lives at risk. With the purpose of minimizing risks, GPR-profiling with 200 MHz antennae was done at two sites, both located in downtown São Paulo, Brazil. The objectives of this work were to map utilities or existing infrastructure in the subsurface in order to orient the construction of the Line 4 (yellow) subway tunnel in São Paulo. GPR profiles can detect water pipes, utility networks in the subsurface, and concrete foundation columns or pilings in subsoil up to 2 m depth. In addition, the GPR profiles also provided details of the target shapes in the subsurface. GPR interpretations combined with lithological information from boreholes and trenches opened in the study areas were extremely important in mapping of the correct spatial distribution of buried utilities at these two sites in São Paulo. This information improves and updates maps of utility placement, serves as a basis for planning of the geotechnical excavation of the Line 4 (yellow) subway tunnel in São Paulo, helps minimize problems related to destruction of preexisting utilities in the subsoil, and avoids risk of dangerous accidents.


► GPR was used for orientate subway tunnel construction in São Paulo City, Brazil.
► GPR profiles detect water pipes and utilities in subsoil up to 2 m depth.
► GPR-3D results provided details of the target shape in subsurface.
► The work was done under field controlled conditions such as trench and wells.
► The results help subway tunnel construction and avoid risk of dangerous accidents.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Applied Geophysics - Volume 80, May 2012, Pages 25–31
نویسندگان
, , , ,