کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
475957 699401 2011 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry
چکیده انگلیسی

Many research initiatives carried out in production management consider process planning and operations scheduling as two separate and sequential functions. However, in certain contexts, the two functions must be better integrated. This is the case in divergent production systems with co-production (i.e. production of different products at the same time from a single product input) when alternative production processes are available. This paper studies such a context and focuses on the case of drying and finishing operations in a softwood lumber facility. The situation is addressed using a single model that simultaneously performs process planning and scheduling. We evaluate two alternative formulations. The first one is based on mixed integer programming (MIP) and the second on constraint programming (CP). We also propose a search procedure to improve the performance of the CP approach. Both approaches are compared with respect to their capacity to generate good solutions in short computation time.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Operations Research - Volume 38, Issue 9, September 2011, Pages 1238–1250
نویسندگان
, , , ,