کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477648 1446174 2008 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
چکیده انگلیسی

Iterated Greedy (IG) algorithms are based on a very simple principle, are easy to implement and can show excellent performance. In this paper, we propose two new IG algorithms for a complex flowshop problem that results from the consideration of sequence dependent setup times on machines, a characteristic that is often found in industrial settings. The first IG algorithm is a straightforward adaption of the IG principle, while the second incorporates a simple descent local search. Furthermore, we consider two different optimization objectives, the minimization of the maximum completion time or makespan and the minimization of the total weighted tardiness. Extensive experiments and statistical analyses demonstrate that, despite their simplicity, the IG algorithms are new state-of-the-art methods for both objectives.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 187, Issue 3, 16 June 2008, Pages 1143–1159
نویسندگان
, ,