کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4913821 1428774 2017 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Fly ash-amended pervious concrete pavement followed by bamboo bioretention basin with Dracaena sanderiana for urban stormwater runoff control
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Fly ash-amended pervious concrete pavement followed by bamboo bioretention basin with Dracaena sanderiana for urban stormwater runoff control
چکیده انگلیسی
This study assessed the feasibility of pervious concrete pavement (PCP) followed by a bamboo bioretention basin (BBB) with Dracaena sanderiana for urban stormwater volume control and water quality enhancement. Two PCPs (nPCP and tPCP) having a permeability of ∼4.5 mm/s were prepared with optimized mix designs. A control impervious concrete pavement (CP) was also prepared. Results showed that both PCP-BBB's outperformed CP-BBB not only in runoff volume reduction, but also in pollutant removal; both PCPs removed a considerably high amount of pollutants, especially in fecal coliform and phosphate removal. tPCP-BBB improved water quality better than nPCP-BBB in terms of chemical oxygen demand and pH. Additionally, D. sanderiana grew healthier in tPCP-BBB than in nPCP-BBB. Production costs for tPCP and CP were similar, whereas nPCP production was twice as expensive.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Construction and Building Materials - Volume 132, 1 February 2017, Pages 161-169
نویسندگان
, , , ,