کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4921294 1429342 2016 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Near term, low cost, 14 MeV fusion neutron irradiation facility for testing the viability of fusion structural materials
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Near term, low cost, 14 MeV fusion neutron irradiation facility for testing the viability of fusion structural materials
چکیده انگلیسی
For over 50 years, engineers have been looking for an irradiation facility that can provide a fusion reactor appropriate neutron spectrum over a significant volume to test fusion reactor materials that is relatively inexpensive and can be built in a minimum of time. The 14 MeV neutron irradiation facility described here can nearly exactly duplicate the neutron spectrum typical of a DT fusion reactor first wall at damage rates of ≈4 displacements per atom and 40 appm He generated over a 2 l volume per full power year of operation. The projected cost of this multi-beam facility is estimated at ≈$20 million and it can be built in <4 years. A single-beam prototype, funded by the U.S. Department of Energy, is already being built to produce medical isotopes. The neutrons are produced by a 300 keV deuterium beam accelerated into 4 kPa (30 Torr) tritium target. The total tritium inventory is <2 g and <0.1 g of T2 is consumed per year. The core technology proposed has already been fully demonstrated, and no new plasma physics or materials innovations will be required for the test facility to become operational.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volumes 109–111, Part B, 1 November 2016, Pages 1072-1076
نویسندگان
, , ,