کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
4925625 | 1431411 | 2016 | 9 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Time delay and profit accumulation effect on a mine-based uranium market clearing model
ترجمه فارسی عنوان
تأخیر زمانی و تاثیر انباشت سود بر مدل پاکسازی بازار اورانیوم معدن
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
مهندسی انرژی و فناوری های برق
چکیده انگلیسی
In this paper front-end nuclear fuel cycle tool is used to simulate market conditions and the effects they have on the stability of U supply. An individual U mine's exit or entry in the market might cause changes in the U supply side which can increase or decrease the market price. In this paper we offer a more advanced version of a mine-based U market clearing model. The existing U market model incorporates the market of primary U from uranium mines with secondary uranium (depleted uranium DU), enriched uranium (HEU) and enrichment services. In the model each uranium mine acts as an independent agent that is able to make operational decisions based on the market price. This paper introduces a more realistic decision making algorithm of individual U mine that adds constraints to production decisions. The authors added an accumulated profit model, which allows for the profits accumulated to cover any possible future economic losses and the time-delay algorithm to simulate delayed process of reopening a U mine. The U market simulation covers time period 2010-2030 in order to illustrate the evolution of the front end markets under increased demand conditions for nuclear fuel. The offered conception is applicable for other nuclear fuel cycle simulators which contains front-end U market model or can be used with reactor models as a separate model. The model can be used to evaluate economic shocks in U supply or demand.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 310, 15 December 2016, Pages 154-162
Journal: Nuclear Engineering and Design - Volume 310, 15 December 2016, Pages 154-162
نویسندگان
Aris Auzans, Allan Teder, Alan H. Tkaczyk,